require_once("docutil.php");
|
|
page_head("Client scheduling policies");
|
|
echo "
|
|
|
|
This document describes two related parts of the BOINC core client:
|
|
<dl>
|
|
<dt><b>CPU scheduling policy</b>
|
|
<dd>
|
|
Of the results that are runnable, which ones to execute?
|
|
BOINC will generally execute NCPUS results at once,
|
|
where NCPUS is the minimum of the physical number of CPUs
|
|
(counting hyperthreading) and the user's 'max_cpus' general preference.
|
|
|
|
<dt><b>Work-fetch policy</b>
|
|
<dd>
|
|
When should the core client ask a project for more work,
|
|
which project should it ask,
|
|
and how much work should it ask for?
|
|
</dl>
|
|
|
|
<p>
|
|
The goals of the CPU scheduler and work-fetch policies are
|
|
(in descending priority):
|
|
<ul>
|
|
<li> Results should be completed and reported by their deadline
|
|
(because results reported after their deadline
|
|
may not have any value to the project and may not be granted credit).
|
|
<li> NCPUS processors should be kept busy.
|
|
<li> At any given point, enough work should be kept on hand
|
|
so that NCPUS processors will be busy for at least
|
|
min_queue days (min_queue is a user preference).
|
|
<li> Project resource shares should be honored over the long term.
|
|
<li> Variety: if a computer is attached to multiple projects,
|
|
execution should rotate among projects on a frequent basis.
|
|
</ul>
|
|
The policies are designed to accommodate all scenarios,
|
|
including those with computers that are slow or are attached
|
|
to a large number of projects.
|
|
|
|
<p>
|
|
In previous versions of BOINC,
|
|
the core client attempted to maintain at least one result
|
|
for each attached project,
|
|
and would do weighted round-robin CPU scheduling among all projects.
|
|
In some scenarios (any combination of slow computer,
|
|
lots of projects, and tight deadlines) a computer could
|
|
miss the deadlines of all its results.
|
|
The new policies solve this problem as follows:
|
|
<ul>
|
|
<li>
|
|
Work fetch is limited to ensure that deadlines can be met.
|
|
A computer attached to 10 projects might
|
|
have work for only a few (perhaps only one) at a given time.
|
|
<li>
|
|
If deadlines are threatened,
|
|
the CPU scheduling policy switches to a mode
|
|
(earliest deadline first) that optimizes the likelihood
|
|
of meeting deadlines, at the expense of variety.
|
|
</ul>
|
|
|
|
|
|
|
|
<h2>Concepts and terms</h2>
|
|
|
|
<h3>Wall CPU time</h3>
|
|
A result's <b>wall CPU time</b> is the amount of wall-clock time
|
|
its process has been runnable at the OS level.
|
|
The actual CPU time may be less than this,
|
|
e.g. if the process does a lot of paging,
|
|
or if other (non-BOINC) processing jobs run at the same time.
|
|
<p>
|
|
BOINC uses wall CPU time as the measure of how much resource
|
|
has been given to each project.
|
|
Why not use actual CPU time instead?
|
|
<ul>
|
|
<li> Wall CPU time is more fair in the case of paging apps.
|
|
<li> The measurement of actual CPU time depends on apps to
|
|
report it correctly.
|
|
Sometimes apps have bugs that cause them to always report zero.
|
|
This screws up the scheduler.
|
|
</ul>
|
|
|
|
|
|
|
|
<h3>Result states</h3>
|
|
A result is <b>runnable</b> if
|
|
<ul>
|
|
<li> Neither it nor its project is suspended, and
|
|
<li> its files have been downloaded, and
|
|
<li> it hasn't finished computing
|
|
</ul>
|
|
A result is <b>runnable soon</b> if
|
|
<ul>
|
|
<li> Neither it nor its project is suspended, and
|
|
<li> it hasn't finished computing
|
|
</ul>
|
|
|
|
|
|
<h3>Project states</h3>
|
|
A project is <b>runnable</b> if
|
|
<ul>
|
|
<li> it has at least one runnable result
|
|
</ul>
|
|
|
|
A project is <b>downloading</b> if
|
|
<ul>
|
|
<li> It's not suspended, and
|
|
<li> it has at least one result whose files are being downloaded
|
|
</ul>
|
|
|
|
A project is <b>contactable</b> if
|
|
<ul>
|
|
<li> It's not suspended, and
|
|
<li> its master file has already been fetched, and
|
|
<li> it's not deferred (i.e. its minimum RPC time is in the past), and
|
|
<li> it's no-new-work flag is not set
|
|
</ul>
|
|
|
|
A project is <b>potentially runnable</b> if
|
|
<ul>
|
|
<li> It's either runnable, downloading, or contactable.
|
|
</ul>
|
|
|
|
<h3>Debt</h3>
|
|
Intuitively, a project's 'debt' is how much work is owed to it,
|
|
relative to other projects.
|
|
BOINC uses two types of debt;
|
|
each is defined for a set S of projects.
|
|
In each case, the debt is recalculated periodically as follows:
|
|
<ul>
|
|
<li> A = the wall CPU time used by projects in S during this period
|
|
<li> R = sum of resource shares of projects in S
|
|
<li> For each project P in S:
|
|
<ul>
|
|
<li> F = P.resource_share / R (i.e., P's fractional resource share)
|
|
<li> W = A*F (i.e., how much wall CPU time P should have gotten)
|
|
<li> P.debt += W - P.wall_cpu_time (i.e. what P should have gotten
|
|
minus what it got).
|
|
</ul>
|
|
<li> P.debt is normalized (e.g. so that the mean or minimum is zero).
|
|
</ul>
|
|
|
|
|
|
<b>Short-term debt</b> is used by the CPU scheduler.
|
|
It is adjusted over the set of runnable projects.
|
|
It is normalized so that minimum short-term debt is zero,
|
|
and maximum short-term debt is no greater than 86400 (i.e. one day).
|
|
|
|
<p>
|
|
<b>Long-term debt</b> is used by the work-fetch policy.
|
|
It is defined for all projects,
|
|
and adjusted over the set of potentially runnable projects.
|
|
It is normalized so that average long-term debt is zero.
|
|
|
|
<h2>The CPU scheduling policy</h2>
|
|
|
|
<p>
|
|
The CPU scheduler uses an earliest-deadline-first (EDF) policy
|
|
for results that are in danger of missing their deadline,
|
|
and round-robin among other projects if additional CPUs exist.
|
|
This allows the client to meet deadlines that would otherwise be missed,
|
|
while honoring resource shares over the long term.
|
|
The scheduler uses the following data, which are obtained
|
|
by a simulation of round-robin scheduling
|
|
applied to the current work queue:
|
|
<ul>
|
|
<li> deadline_missed(R): whether result R would miss
|
|
its deadline with round-robin scheduling.
|
|
<li> deadlines_missed(P):
|
|
the number of results of P whose deadlines would
|
|
be missed with round-robin scheduling.
|
|
</ul>
|
|
The scheduling policy is:
|
|
<ol>
|
|
<li> Find the project P for which deadlines_missed(P)>0,
|
|
and whose earliest deadline is earliest.
|
|
<li> Schedule deadline_missed(P)
|
|
results of P in order of increasing deadline,
|
|
with preference to those already running.
|
|
<li> If there are more CPUs, and other projects for which
|
|
deadlines_missed(P)>0, go to 1.
|
|
<li> If all CPUs are scheduled, stop;
|
|
otherwise continue to the next step, considering
|
|
only projects with deadlines_missed==0.
|
|
<li> Set the 'anticipated debt' of each project to its short-term debt
|
|
<li> Find the project P with the greatest anticipated debt,
|
|
select one of P's runnable results
|
|
(picking one that is already running, if possible)
|
|
and schedule that result.
|
|
<li> Decrement P's anticipated debt by the 'expected payoff'
|
|
(the total wall CPU in the last period divided by NCPUS).
|
|
<li> Repeat steps 6 and 7 for additional CPUs
|
|
</ol>
|
|
|
|
<p>
|
|
The CPU scheduler runs when a result is completed,
|
|
when the end of the user-specified scheduling period is reached,
|
|
when new results become runnable,
|
|
or when the user performs a UI interaction
|
|
(e.g. suspending or resuming a project or result).
|
|
|
|
<h2>Work-fetch policy</h2>
|
|
|
|
<p>
|
|
The work-fetch policy uses the functions
|
|
<pre>
|
|
prrs(project P)
|
|
</pre>
|
|
<blockquote>
|
|
P's fractional resource share among potentially runnable projects.
|
|
</blockquote>
|
|
|
|
<pre>
|
|
min_results(project P)
|
|
</pre>
|
|
<blockquote>
|
|
The minimum number of runnable results needed to
|
|
maintain P's resource share on this machine: namely,
|
|
<br>
|
|
ceil(ncpus*prrs(P))
|
|
</blockquote>
|
|
<pre>
|
|
time_until_work_done(project P)
|
|
</pre>
|
|
<blockquote>
|
|
The estimated wall time until the number of
|
|
uncompleted results for this project will reach min_results(P)-1,
|
|
assuming round-robin scheduling among
|
|
the current potentially runnable projects.
|
|
</blockquote>
|
|
<p>
|
|
The work-fetch policy function is called every 5 seconds
|
|
(or as needed) by the scheduler RPC polling function.
|
|
</pre>
|
|
It sets the following variable for each project P:
|
|
<p>
|
|
<b>work_request_size(P)</b>:
|
|
the number of seconds of work to request if we do a scheduler RPC to P.
|
|
This is
|
|
<ul>
|
|
<li>
|
|
0 if P is suspended, deferred, or no-new-work
|
|
<li>
|
|
0 if time_until_work_done(P) > min_queue
|
|
<li>
|
|
0 if CPU scheduler scheduled all CPUs by EDF
|
|
<li>
|
|
0 if P.long_term_debt < -(CPU sched interval)
|
|
(project has been using more than its share of CPU;
|
|
e.g. repeatedly doing short-deadline results).
|
|
<li>
|
|
otherwise:
|
|
(min_queue*ncpus*prrs(P)) - (estimated wall time of queued work)
|
|
</ul>
|
|
|
|
<p>
|
|
The scheduler RPC mechanism may select a project to contact
|
|
because of a user request, an outstanding trickle-up message,
|
|
or a result that is overdue for reporting.
|
|
If it does so, it will also request work from that project.
|
|
Otherwise, the RPC mechanism chooses the project P for which
|
|
<pre>
|
|
P.work_request_size>0 and
|
|
P.long_term_debt - time_until_work_done(P) is greatest
|
|
</pre>
|
|
and gets work from that project.
|
|
<hr>
|
|
Scheduler request must include:
|
|
whether sporadic network connection (period);
|
|
whether in EDF mode.
|
|
Resource fractions?
|
|
<p>
|
|
Scheduler reply should include (it no work sent)
|
|
if reason is because we're overloaded.
|
|
<p>
|
|
If last response was 'no work', don't accumulate LTD.
|
|
|
|
";
|
|
page_tail();
|
|
?>
|