boinc/doc/sched_policy.html

26 lines
1.2 KiB
HTML

<title>Scheduling Server: Policy</title>
<body bgcolor=ffffff>
<h2>Scheduling Server: Policy</h2>
<p>
The scheduling server will attempt to send enough work to excede a
hosts high water mark.
If the amount of work the scheduling server is
sending exceeds four weeks, the scheduling server will not attach more
work to a scheduler reply.
This does not prevent the scheduling server
from sending a work unit that takes more than four weeks, but merely
from attaching more work after a scheduler reply has four weeks of work.
If a work unit uses more disk resources than a host has available, the
scheduling server will not attach that work unit.
The scheduling server
estimates the amount of time a work unit will take to complete with the
formula <b>(number of fpops)/(fpops per second)+(number of iops)/(iops
per second)</b>.
The number of fpops and number of iops are provided by
the backend when creating the work unit, and the calculation speeds are
included in a scheduler request.
If no work is available, the scheduling
server sends the message <tt>no work available</tt> with priority
<tt>low</tt>, and requests that the client wait before sending another
scheduler request.