Old:
1) check deadline based on wu.delay_bound
2) in add_result_to_reply(), potentially modify wu.delay_bound,
e.g. because of retry acceleration
problem: reducing delay bound may cause deadline miss
New:
1) new function get_delay_bound_range()
(called from wu_is_infeasible_fast())
returns optimistic and pessimistic delay bounds.
Retry acceleration logic is here.
2) check deadline based on optimistic bound;
if that fails, check based on pessimistic bound.
Set wu.delay_bound to the one that worked.
Notes:
- get_delay_bound_range() needs result priority and report deadline,
and it's called before we read the full result.
So add these items to WORK_ITEM and WU_RESULT.
- get_delay_bound_range() could be customized for
project-specific deadline policy.
- add_result_to_reply() was becoming a toxic waste dump.
Deadline-related stuff should have been factored out in any case.
svn path=/trunk/boinc/; revision=18946