@ -80,11 +80,9 @@ Why not use actual CPU time instead?
|
|||
<li> The measurement of actual CPU time depends on apps to
|
||||
report it correctly.
|
||||
Sometimes apps have bugs that cause them to always report zero.
|
||||
This screws up the scheduler.
|
||||
</ul>
|
||||
|
||||
|
||||
|
||||
<h3>Result states</h3>
|
||||
R is <b>runnable</b> if
|
||||
<ul>
|
||||
|
@ -176,20 +174,39 @@ and weighted round-robin among other projects if additional CPUs exist.
|
|||
This allows the client to meet deadlines that would otherwise be missed,
|
||||
while honoring resource shares over the long term.
|
||||
<p>
|
||||
The scheduler starts by doing a simulation of round-robin scheduling
|
||||
The scheduler starts by doing a simulation of weighted round-robin scheduling
|
||||
applied to the current work queue.
|
||||
This produces the following outputs:
|
||||
<ul>
|
||||
<li> deadline_missed(R): whether result R misses its deadline.
|
||||
<li> deadlines_missed(P):
|
||||
the number of results R of P for which deadline_missed(R).
|
||||
<li> total_work_before_minq:
|
||||
the wall CPU time used in the next min_queue seconds
|
||||
<li> total_shortfall:
|
||||
the additional wall CPU time needed to keep all CPUs busy
|
||||
for the next min_queue seconds
|
||||
(this is used by the work-fetch policy, see below).
|
||||
<li> work_before_minq(P):
|
||||
the wall CPU time used by project P in the next min_queue seconds
|
||||
<li> shortfall(P):
|
||||
the additional wall CPU time needed for project P
|
||||
to keep it from running out of work in the next min_queue seconds
|
||||
(this is used by the work-fetch policy, see below).
|
||||
</ul>
|
||||
<p>
|
||||
In the example below, projects A and B have resource shares
|
||||
2 and 1 respectively.
|
||||
A has results A1 and A2, and B has result B1.
|
||||
The computer has two CPUs.
|
||||
From time 0 to 4 all three results run with equal weighting.
|
||||
At time 4 result A2 finishes.
|
||||
From time 4 to 8, project A gets only a 0.5 share
|
||||
because it has only one result.
|
||||
At time 8, result A1 finishes.
|
||||
<p>
|
||||
In this case, shortfall(A) is 4,
|
||||
and total_shortfall is 2.
|
||||
|
||||
<br>
|
||||
<img src=rr_sim.png>
|
||||
<br>
|
||||
The scheduling policy is:
|
||||
<ol>
|
||||
<li> Let P be the project with the earliest-deadline runnable result
|
||||
|
@ -240,12 +257,6 @@ it is always left in memory on preemption.
|
|||
|
||||
<h2>Work-fetch policy</h2>
|
||||
|
||||
<p>
|
||||
When a result runs in EDF mode,
|
||||
its project may get more than its share of CPU time.
|
||||
The work-fetch policy is responsible for
|
||||
ensuring that this doesn't happen repeatedly.
|
||||
It does this by suppressing work fetch for the project.
|
||||
<p>
|
||||
A project P is <b>overworked</b> if
|
||||
<ul>
|
||||
|
@ -256,7 +267,7 @@ This condition occurs if P's results run in EDF mode
|
|||
(and in extreme cases, when a project with large negative LTD is detached).
|
||||
The work-fetch policy avoids getting work from overworked projects.
|
||||
This prevents a situation where a project with short deadlines
|
||||
monopolizes the CPU.
|
||||
gets more than its share of CPU time.
|
||||
|
||||
<p>
|
||||
The work-fetch policy uses the functions
|
||||
|
@ -267,16 +278,6 @@ frs(project P)
|
|||
P's fractional resource share among fetchable projects.
|
||||
</blockquote>
|
||||
|
||||
<pre>
|
||||
work_to_fill_buf(P)
|
||||
</pre>
|
||||
The amount of work needed to keep P busy for the next min_queue seconds,
|
||||
namely:
|
||||
<pre>
|
||||
y = min_queue*ncpus - work_before_minq(P)
|
||||
if (y <= 0) return 0
|
||||
return y/frs(P)
|
||||
</pre>
|
||||
<p>
|
||||
The work-fetch policy function is called every few minutes
|
||||
(or as needed) by the scheduler RPC polling function.
|
||||
|
@ -289,9 +290,9 @@ for each project P
|
|||
if P is suspended, deferred, overworked, or no-new-work
|
||||
P.work_request_size = 0
|
||||
else
|
||||
P.work_request_size = work_to_fill_buf(P)
|
||||
P.work_request_size = shortfall(P)
|
||||
|
||||
if min_queue*ncpus > total_work_before_minq
|
||||
if total_shortfall > 0
|
||||
if P.work_request_size==0 for all P
|
||||
for each project P
|
||||
if P is suspended, deferred, overworked, or no-new-work
|
||||
|
@ -305,8 +306,7 @@ if min_queue*ncpus > total_work_before_minq
|
|||
P.work_request_size = 1
|
||||
|
||||
if P.work_request_size>0 for some P
|
||||
Normalize P.work_request_size so that they
|
||||
sum to min_queue*ncpus - total_work_before_minq
|
||||
Normalize P.work_request_size so that they sum to total_shortfall
|
||||
and are proportional to P.resource_share
|
||||
</pre>
|
||||
|
||||
|
@ -318,7 +318,7 @@ If it does so, it will also request work from that project.
|
|||
Otherwise, the RPC mechanism chooses the project P for which
|
||||
<pre>
|
||||
P.work_request_size>0 and
|
||||
P.long_term_debt + work_to_fill_buf(P) is greatest
|
||||
P.long_term_debt + shortfall(P) is greatest
|
||||
</pre>
|
||||
and gets work from that project.
|
||||
<hr>
|
||||
|
|
|
@ -32,6 +32,10 @@ if (project_is_stopped()) {
|
|||
echo "
|
||||
<min_passwd_length>$min_passwd_length</min_passwd_length>
|
||||
";
|
||||
$forum_version = parse_config($config, '<forum_version');
|
||||
if ($forum_version> {
|
||||
echo " <forum_version>$forum_version</forum_version>\n";
|
||||
}
|
||||
}
|
||||
echo "
|
||||
</project_config>
|
||||
|
|
Loading…
Reference in New Issue